Search

Projects In Progress

YGGIC Energy Centre

We’re proud to announce that John Perkins Construction has been appointed to deliver a major low-carbon heating upgrade at YGGIC, supporting Newport City Council’s net-zero targets.
As part of the Council’s decarbonisation programme, this project will see the replacement of fossil fuel-based heating systems with air source heat pump (ASHP) technology, forming a key step in reducing the school’s carbon footprint and creating a more sustainable future for Newport’s young learners.

Our team will be delivering the full mechanical and electrical installation, including:
• Installation of 2 Air Source Heat Pumps
• Construction of a dedicated external ASHP compound and new Energy Centre to house the distribution pump, buffer vessel and ancillary equipment
• Decommissioning of existing gas calorifiers and installation of heat pump water heaters for domestic hot water in both plant rooms.

We’re thrilled to continue our relationship with YGGIC and Newport City Council, supporting the transformation of Newport’s schools into future-ready, energy-efficient environments, and we look forward to delivering this scheme to the highest standard.

Secure Meters are a multinational company who create solutions for metering billing and collection, pump efficiency (ESCO), controlling heating and cooling, energy auditing, asset monitoring, older adult care, and more who have appointed us to fit out their new industrial unit based in Filton.

Jo Bird and Co ltd is a UK based company, internationally recognised leader in the design and manufacture of lifesaving and fire safety equipment storage. We have been tasked with the removal of an old cement sheet roofing and replacing it with new insulated roof panels and a PV array at their main premises in Highbridge.

Coleg Gwent has chosen us once more, from their framework of preferred contractors to which we have been re awarded a place, to complete complex enabling works on their Cross Keys Campus. We are proud to have been entrusted with this work in diverting major utility supplies and area remodelling in preparation for major works in the coming years.

2 Harbour RoadPortishead is an office building which requires the replacement of three projecting window units which have failed. A critical part of this work is for us to apply our experience to rethink and improve the current detailing.